PassLeader 100% Pass Ensure DELL-EMC E20-598 Dumps VCE and Dumps PDF (Question 1 – Question 16)

Latest E20-598 Dumps in VCE and PDF from PassLeader: https://www.passleader.com/e20-598.html (186 Q&As), welcome to download the latest DELL&EMC E20-598 exam dumps from PassLeader.com. PassLeader.com has the most valid E20-598 exam dumps, which will help you passing E20-598 exam easily! Both E20-598 VCE and PDF dumps are available now, 100% pass ensure.

Besides, you can download the latest PassLeader E20-598 Dumps online for FREE: https://drive.google.com/open?id=1URtmrUyTbL3Zw3INiqFX9vaWh6JwDag0

QUESTION 1
Which port on the Avamar server does the client connect to when performing a backup with encryption enabled?

A.    27000
B.    28001
C.    28002
D.    29000

Answer: D

QUESTION 2
Which time zone is used on EMC Avamar nodes?

A.    Local time on the utility node; GMT/UTC on the storage nodes.
B.    GMT/UTC on the utility node; local time on the storage nodes.
C.    All node types use the local time.
D.    All nodes use GMT/UTC time.

Answer: A

QUESTION 3
In an EMC Avamar backup operation, which process always produces identical chunk results given the same data?

A.    Sticky-byte factoring
B.    Compression
C.    File caching
D.    Hashing

Answer: A

QUESTION 4
On an EMC Avamar server, what is the file extension of stripes that contain backup chunks?

A.    *.dat
B.    *.usd
C.    *.chd
D.    *.cdt

Answer: A

QUESTION 5
A customer is unable to connect to their EMC Avamar server when using the Avamar Administrator GUI. If default settings are being used, which port must be open for a successful connection?

A.    5555
B.    7778
C.    8443
D.    8080

Answer: B

QUESTION 6
Which interface is used to start Avamar Client Manager?

A.    Enterprise Manager
B.    Command Line
C.    Cron Job
D.    Avamar Administrator

Answer: A

QUESTION 7
Which size Avamar Gen4 storage node is supported for a RAIN configuration?

A.    1.0 TB
B.    1.3 TB
C.    2.6 TB
D.    3.9 TB

Answer: D

QUESTION 8
Which processes are started automatically during an EMC Avamar Windows client installation?

A.    avagent and avscc only.
B.    avtar and avagent only.
C.    avtar, avagent, and avscc.
D.    avscc and avtar only.

Answer: A

QUESTION 9
Which administrative tasks can be performed using the EMC Avamar Enterprise Manager?

A.    Configure replication, run reports, and view operational status.
B.    Configure backups, view operational status, and run reports.
C.    Run reports, configure backups, and configure replication.
D.    View operational status, configure replication, and configure backups.

Answer: A

QUESTION 10
What is the first process performed by avatar when running an EMC Avamar backup?

A.    Traverses each directory in the backup dataset
B.    Checks the client’s file cache
C.    Runs sticky-byte factoring
D.    Writes to the hash cache file

Answer: A

QUESTION 11
A company wants to back up their EMC Celerra to their Avamar server. Where is the Avamar backup client software installed?

A.    Accelerator Node
B.    Celerra Data Mover
C.    Proxy Server
D.    Utility Node

Answer: A

QUESTION 12
By default, which port is required to be open on the firewall for client communications with the EMC Avamar utility node?

A.    7778
B.    27000
C.    28001
D.    29000

Answer: C

QUESTION 13
How much RAM is required for an EMC Avamar Gen4 utility node?

A.    4 GB
B.    8 GB
C.    12 GB
D.    24 GB

Answer: C

QUESTION 14
During an EMC Avamar backup, which Avamar server process communicates with the avtar process on the client?

A.    GSAN
B.    MCS
C.    avagent
D.    avmgr

Answer: A

QUESTION 15
What is the maximum number of nodes that can be configured for an EMC Avamar multi-node grid?

A.    15 storage, 1 utility, 1 NDMP, and 1 spare.
B.    16 storage, 1 utility, and 1 spare.
C.    17 storage and 1 utility.
D.    17 storage, 1 utility, and 1 spare.

Answer: B

QUESTION 16
A company is using an EMC Avamar multi-node server with 2 TB storage nodes. The company wants to add 3 TB of Avamar storage to the multi-node server. How can this be achieved?

A.    Add one 3.3 TB storage node
B.    Add two 2 TB AVEs
C.    Add two 2 TB storage nodes
D.    Add three 1 TB storage nodes

Answer: C


Welcome to try PassLeader E20-598 VCE and PDF dumps: https://www.passleader.com/e20-598.html (186 Q&As)

Or, download more PassLeader E20-598 dumps for FREE: https://drive.google.com/open?id=1URtmrUyTbL3Zw3INiqFX9vaWh6JwDag0